제품 정보로 건너뛰기
1 3

KOEED

1PCS TA3A3 17689 230V 85W cooling fan

1PCS TA3A3 17689 230V 85W cooling fan

정가 $304.40 USD
정가 $304.40 USD 할인가 $304.40 USD
할인 품절
배송료는 결제 시 계산됩니다.
Condition new
Model TA3A3
UPC Does not apply
Country of Origin China
수량
Chat on WhatsApp
전체 세부 정보 보기
  • step 1: Quote Or Shop Now

    You can place an order directly or contact us via email and whatsapp for a quote

  • step 2: Confirmation and delivery

    After placing an order, we will contact you by email or WhatsApp within three days to provide photos and videos of the product for confirmation and then ship it.

TA3A3-17689 — 230V AC 85W Industrial Cooling Fan for Control Cabinets

AC AXIAL FAN · 85W · 230VAC SINGLE-PHASE · CABINET & PANEL COOLING

The TA3A3-17689 is a single-phase 230VAC axial cooling fan rated at 85 watts, designed for continuous-duty heat extraction inside factory automation cabinets, variable-frequency drive enclosures, welding-machine IGBT stacks and CNC backs. It is a direct drop-in for legacy AC-fan cutouts where the static pressure and duty cycle of a small DC fan would be insufficient, and where a 24VDC rail is not available inside the cabinet. KOEED sources this part alongside the broader cooling fan category for industrial automation spares.

Lead time, datasheet and price are released on RFQ. For a 24-hour response on this part number, email Moritta@KOEED.COM with the line-down context, or open the Create a Quote form.

Key Technical Specifications

Part Number TA3A3-17689
Fan Type AC axial cooling fan, single-phase, sleeve or ball bearing
Operating Voltage 230V AC, 50 / 60 Hz
Power Consumption 85 W
Frame Size 172 × 150 × 51 mm (standard AC axial form factor)
Bearing Sleeve bearing; long-life ball-bearing variant available on request
Termination 2-lead pigtail (Line / Neutral); Earth tab on housing
Duty Rating Continuous, industrial environment
Stock Status In stock — quote within 24h at Moritta@KOEED.COM

Application Scenarios & Where It Fits

The TA3A3-17689 is engineered for industrial environments where DC fans fall short on either static pressure or duty cycle. Across the nine KOEED brand lines, we see this part most often deployed in:

  • Variable-frequency drives from Allen-Bradley PowerFlex and Yaskawa Σ-7 / Σ-V cabinets, where the heatsink demands steady forced-air flow
  • SIMATIC S7-300 / S7-1500 backplane cooling inside Siemens control cabinets and ET200 sub-racks
  • Welding-machine IGBT extraction, inverter cubicles and rectifier stacks on the factory floor
  • UPS systems, server-room PDUs and battery banks that need forced-air thermal management on 230VAC mains
  • Mitsubishi MELSEC Q / iQ-R racks and Fanuc CNC spindle-drive cabinets with sealed enclosures
  • Industrial control panels integrating Omron CP1 / CJ2, Schneider Modicon M340 / M580, Panasonic FP PLCs or KEYENCE vision-system processor racks
  • General process control, water-treatment skids and packaging-line enclosures in manufacturing cells

Because it accepts 230VAC directly, the TA3A3-17689 is a preferred substitute for legacy AC axial fans inside older Allen-Bradley, Siemens and Schneider cubicles that originally shipped with mains-powered ventilation. Browse the full all-collection index for complementary drives, PLCs and contactors.

Integration & Wiring Notes

Because the TA3A3-17689 runs on mains 230VAC rather than 24VDC, the wiring path differs from a typical PLC rack fan. Keep these points in mind when retrofitting or designing a new build, and consult the PLC error-code database if a downstream drive faults on a fan-loss interlock.

  • Power the fan from a dedicated 230V branch circuit protected by an MCB or fused disconnect — do not back-feed from a 24VDC power supply.
  • Use a separate neutral conductor. Bond the fan chassis to cabinet PE and route the green/yellow earth to the cabinet ground bar.
  • Pair with a normally-closed thermal contact (NC Klixon / thermostat) when the fan must cut off on overtemperature. Verify your VFD or drive supports an external fan interlock before wiring.
  • Maintain at least 50 mm clearance on the intake side and 80 mm on the exhaust side to preserve rated airflow; blocked intakes cause rapid bearing wear.
  • Where noise is critical (lab enclosures, operator stations), step down to a lower-RPM DC variant from the cooling fans range.
  • Replace only with the same voltage class — this AC fan cannot be powered from a 24VDC rail without risking capacitor failure.
  • When integrating with a Omron CP1W or a Panasonic FP PLC, route the fan supply through a contactor driven by a digital output so the controller can cycle the fan on duty.

Installation & Commissioning Tips

Field engineers usually spend more time fighting vibration than wiring. The TA3A3-17689 ships ready to mount in a standard 172×150mm panel cutout, but a few installation habits will extend its service life inside the cabinet and on the shelf of your industrial spare-parts inventory:

  • Mount with all four corner screws torqued evenly to avoid rotor rub; over-tightening distorts the housing and shifts the impeller.
  • Add a foam gasket or rubber isolator between the fan flange and the cabinet panel to dampen the 50/60 Hz hum into a steel enclosure.
  • Apply a finger-guard or filter mat on the intake if the cabinet sits on a factory floor with airborne dust or oil mist.
  • Power the fan up before energising the drive or PLC to verify rotation direction matches the airflow arrow on the housing.
  • Log the install date and bearing type on the cabinet label — sleeve-bearing fans typically swap at 25,000 hours, ball-bearing at 50,000+ hours.
  • If a fan is failing on a running line and you cannot stop it, you can stage a replacement through KOEED emergency sourcing — see the AI Diagnostic Tool for a faster cross-reference match.
  • For multi-fan panels, balance the in-line and out-line flow so cabinet pressurisation stays slightly positive — this keeps dust out of PLCs from Siemens, Mitsubishi and Allen-Bradley.

Procurement, Warranty & Lead Time

TA3A3-17689 is held in our Shenzhen / Hong Kong dual-base stock and ships worldwide. Pricing is request-only — KOEED is an RFQ-driven B2B sourcing house, so please send the part number (and any cross-reference if you have a discontinued alternative) to Moritta@KOEED.COM for a same-business-day quote. Bulk and panel-builder discounts are evaluated per BOM.

Standard procurement terms:

  • Lead time: typically 3–7 business days for in-stock units; expedited airfreight is available for line-down emergencies.
  • Warranty: 12-month replacement on DOA units; a pre-shipment QC report can be attached on request.
  • Worldwide shipping via DHL / FedEx / UPS with tracking; commercial invoice and packing list are provided for customs clearance.
  • Acceptable payment: T/T, PayPal, and major credit cards for samples.
  • Cross-reference and migration: send the old part number you are replacing (for example, a discontinued AC fan inside a Yaskawa, Schneider or Fanuc cabinet) and we will confirm the TA3A3-17689 as a mechanical and electrical equivalent.
  • For multi-line panel builders, request the matched Allen-Bradley, Siemens, Mitsubishi or Schneider components on the same shipment through one consolidated invoice.

For a full cabinet BOM — drives, PLCs, contactors, and cooling fans in one shipment — use the Create a Quote form or email Moritta@KOEED.COM directly with your instruments list. New automation releases and field notes are tracked on the Daily PLC News blog, and any operational question can be sent to the team via the Contact Us page.

Need this fan or a full cabinet BOM?

Send the part number to Moritta@KOEED.COM and we will reply with availability, lead time and pricing within 24 hours.

Request a Quote →

Browsing our full multi-brand automation catalogue?

Explore All Collections →

Related brand collections: Allen-Bradley · Siemens · Mitsubishi · Omron · Fanuc · Schneider · Yaskawa · Panasonic · KEYENCE.

About Koeed Automation

Expert Supply Solutions for Global Industrial Electronics

At Koeed.com, we are professional architects of the industrial electronics supply chain. We specialize in providing high-performance PLCs, HMIs, Servo Motors, Drives, and Converters to ensure that modern manufacturing operations remain efficient, reliable, and future-proof in 2026’s competitive landscape.

🛡️ Certified Quality

We source only 100% authentic industrial hardware from global category leaders. Every component undergoes a rigorous verification process to meet Industry 4.0 reliability standards.

⚙️ Engineering Domain

Our experts provide more than just parts; we offer technical insight. We assist in complex product selection and compatibility audits for both legacy system upgrades and new installations.

🌐 Rapid Global Logistics

Time is money in industrial automation. Our optimized supply network ensures that critical components reach your facility quickly, significantly reducing unplanned downtime and operational loss.

Strategic Global Portfolio: Siemens, Omron, FANUC, Schneider Electric, Mitsubishi, Yaskawa, Allen-Bradley, and other elite industrial brands.

Supporting your vision for a smarter, more efficient industrial future.

Special Reminder

Important

If you have any questions about product information and prices, please feel free to contact us by email or WhatsApp. We will respond quickly.

  • Business Days Only (Monday through Saturday)
  • It takes up to 10 days from the time of ordering (excluding Saturdays and Sundays) to the time of delivery to your designated location. Worldwide delivery.
  • Within 3 days after placing the order, we will send you photos and videos of the product via email or WhatsApp for confirmation

International shipping - items may be subject to customs processing depending on the item's customs value.
Sellers declare the item's customs value and must comply with customs declaration laws.
As the buyer, you should be aware of possible:

  • Delays from customs inspection.
  • Import duties and taxes which buyers must pay.
  • Brokerage fees payable at the point of delivery.

Shipping Policy

Global Delivery

We ship to customers all over the world. Our primary logistics providers are DHL, UPS, TNT, FedEx, and EMS.

Processing Time

All orders are processed within 72 hours of purchase. Please note that this applies to business days only.

Shipping Rates & Delivery Estimates

Shipping charges for your order will be calculated and displayed at checkout. Delivery estimates are within 7-14 days. Please note that these shipping times are only estimates and unfortunately, cannot be guaranteed.

Shipment Confirmation & Order Tracking

You will receive a Shipment Confirmation email once your order has shipped containing your tracking number(s). The tracking number will be active within 24 hours.

Customs, Duties, and Taxes

Please note, international shipping services do vary from country to country. To find out the exact services that are available, please put in your full address at checkout. Shipping internationally does mean that you may be required to pay customs and import taxes. All international customers are responsible for the customs rates within their own country. For further information, we recommend contacting your local customs office.

Damages

We take every reasonable precaution to ensure that products are not damaged. If the item is damaged in transit, please immediately contact us. We are not liable for any products damaged or lost during shipping. If you received your order damaged, please contact the shipment carrier to file a claim. Please save all packaging materials and damaged goods before filing a claim.

Force Majeure

When encountering with force majeure, the processing of orders will be delayed. Nevertheless, it is ensured that your order will be processed in a fast manner when weather permits.

Address Verification

Please verify you have the correct shipping address on your order PRIOR to making payment as this is the address we will ship to.

Return Policy

For more information, visit our Return Policy page.

International shipping - items may be subject to customs processing depending on the item's customs value.

Sellers declare the item's customs value and must comply with customs declaration laws.
As the buyer, you should be aware of possible:
• Delays from customs inspection.
• Import duties and taxes which buyers must pay.
• Brokerage fees payable at the point of delivery.

Contact Us

If you have any questions about your order, please contact us at moritta@koeed.com.

Return Policy

Return and Refund Policy

We want you to be completely satisfied with your purchase on our store. If for any reason you are not entirely satisfied, we're here to help!

Returns

You have a generous 30 calendar days to return an item from the date you received it. To be eligible for a return, ensure the item is in its original, unworn, and unused condition with tags and packaging intact. Retain your receipt or proof of purchase for eligibility. Please note that certain items are non-returnable like perishables, custom products, personal care goods, hazardous materials, flammable liquids, and gases. Reach out for clarifications on specific items.

Return Process

Commence the return process by reaching out to us at moritta@koeed.com. Upon approval, we will furnish you with a return shipping label and detailed instructions for dispatching your package. Unnotified returns will not be accepted.

Damages and Issues

Kindly review your order upon delivery. Notify us promptly if it arrives defective, damaged, or incorrect. We will address the matter swiftly.

Exchanges

Facilitate a swift exchange by returning the original item once approved and making a new purchase.

EU 14-Day Cooling Off Period

EU-bound shipments allow a 14-day cancellation or return period without justification. Conditions mirror standard returns.

Refunds

Upon receiving and inspecting your return, we’ll inform you of the refund status. Approved refunds are automatically processed within 10 business days via the initial payment method. Allow time for financial institutions to finalize the refund. For delays exceeding 15 business days post-approval, contact us at moritta@koeed.com.

Shipping

You will be responsible for paying for your own shipping costs for returning your item. Shipping costs are non-refundable. If you receive a refund, the cost of return shipping will be deducted from your refund.

Contact Us

If you have any questions on how to return your item to us, feel free to contact us at moritta@koeed.com.

Related manufacturers